18pcs
Automatic robot welding machines
Two robot welding workshops with 20 Panasonic robot welding arms, set up in 2008.
Turnover Material Rack
The low, wide stacking frame. PFSF010 puts the family's shortest 1235 mm posts on its widest 1570 × 1320 mm deck, a low-profile platform the original description specifies with four-way forklift entry, so the frame moves through workshop aisles, cold storage and dock transfers from whichever side the truck arrives.
Workshops Storage Transport Powder Coating Stacking Frames is a product that encompasses various equipment and solutions designed to streamline the storage, transport, and powder coating process in workshops. These stacking frames are specifically designed to provide a reliable and efficient solution for organizing and transporting items during manufacturing or production operations. The primary purpose of these frames is to maximize storage space and optimize organization within a workshop setting.
They are typically constructed with durable materials such as steel or aluminum, ensuring their ability to withstand heavy loads and constant use. The frames often feature a stacking design, allowing them to be securely stacked on top of each other, minimizing the required floor space. Additionally, these frames play a crucial role in the powder coating process. Powder coating is a popular finishing technique that involves the application of dry paint particles to a surface.
The stacking frames offer a convenient solution for holding and preparing the items to be powder-coated, allowing for an efficient and smooth workflow. The frames are specially designed to accommodate various shapes and sizes, ensuring compatibility with a wide range of items. Workshops Storage Transport Powder Coating Stacking Frames provide a range of benefits including increased productivity, improved organization, and enhanced safety. By utilizing these frames, workshops can significantly reduce clutter, minimize the risk of damage to materials, and streamline the movement of items throughout the facility.
This category offers a diverse selection of stacking frames, including different sizes, load capacities, and configurations, allowing workshops to choose the most suitable solution for their specific needs.
These are the fields a workshop buyer checks first, as printed on the factory sheet. Full dimension drawings are sent with the quotation.
| Model | PFSF010 |
|---|---|
| Overall Size (L × W × H) | 1570 × 1320 × 1235 mm |
| Rated Load | 1,000 kg per frame |
| Suitable For | Pallet 1210 (single-deck) |
| Surface Treatment | Powder coating |
The family's shortest clearance on its widest bearing area, a low frame for dense stacks of goods that do not stand tall, with the same 1,000 kg rating as every model in the range.
The original description calls it compatible with forklift four-way fork pick-up and free to combine and lay out, so the frame is approached from any side the aisle allows.
The taller builds on this chassis are the large-capacity PFSF011 frame at 1435 mm and the PFSF012 post pallet at 1535 mm.
The original description places it on production lines, in cold storage and at dock transfers.
The original description names line-side staging in the workshop, keeping materials within reach and moving on to warehousing and distribution when the shift ends.
Cold storage is listed in the original description, and the powder coat protects the steel in humid rooms while the low stack keeps dense cold space working.
Docking with transport vehicles is a use case in the original description, and four-way fork entry means the transfer never waits for the frame to be turned.
The load capacity is 1,000 kg per frame.
It measures 1570 × 1320 × 1235 mm.
The surface treatment is powder coating.
Forks can enter the base from all four sides, as the original description specifies. In a tight workshop aisle or at a dock, the truck takes the frame as it stands instead of waiting for it to be turned.
Density. Posts taller than the goods waste space, so 1235 mm posts stack more layers under the same ceiling, and the 1570 x 1320 mm deck gives each layer the most bearing area in the family.
The original description lists cold storage among its scenarios, and the dense, uniform powder coating protects the steel in humid environments.
The factory sheet lists 1210 pallets (single-deck). The original description also notes that sizes can be customized, with OEM dimensions taken from your drawings and confirmed before production.
Packing and Shipping
Each batch passes final inspection and ships with a quality inspection report.
Products are packed folded, stacked or knocked down where the design allows, to save container space.
The container count for this model is planned and quoted with your order.
Sea freight is priced per container, so the rate divides across every unit in the loading plan.
With the quantity and destination port, we reply with a loading plan and a per-unit freight estimate.

Inquiry
ProductWorkshops Storage Transport Powder Coating Stacking Frames
Drawings, price requests and factory visit requests are answered within 24 hours on working days.
With the quantity and destination port, we reply with a loading plan and a per-unit freight estimate.
Each batch passes final inspection and ships with a quality inspection report.
Factory
18pcs
Two robot welding workshops with 20 Panasonic robot welding arms, set up in 2008.
6,000W
A 6,000 W laser plate cutting machine and a 3,000 W laser pipe cutting machine, added in 2022.
4steps
Incoming materials, in-process checks, inspection before surface treatment and final inspection before shipment. A quality inspection report is provided before shipment.
ISO9001 certified quality system. See the factory.
Proof & Qualifications
Authorized patents covering trolleys, racks and transfer equipment,
and ISO9001 quality system certification.
Who We Are
Established in 1984, Ping Fang is a trolley and storage rack manufacturer specializing in the research, development and manufacturing of logistics equipment, including logistics trolleys, milk trolleys, turnover racks and wire mesh products. The company covers about 27,076 square meters, including 12,000 square meters of standardized workshops.
Around 70 employees work at Ping Fang, more than 28% of whom are technical engineers. Production is supported by 18 automatic robot welding machines, large laser cutting machines, an automatic painting line, packing assembly lines, sand blasting machines and many other professional facilities.
Beyond core logistics equipment, we have manufactured customer-designed OEM products for many years, including storage containers, indoor and outdoor furniture, safety barriers and fences, and road and building structural parts exported to Europe and the United States. Ping Fang holds authorized patents for trolleys, racks and transfer equipment, is ISO9001 certified and keeps focusing on stable quality in every batch. The turnover was about 18 million in 2008.
Competitive prices, reliable quality, swift delivery and good service are our general principles.
40+
Years of Experience
70+
Professional Staff
28%
Technical Engineers
24h
Inquiry Response
We reply to inquiries within 24 hours on working days.